Posting 102370: Emergency Load Mgmt Reduction Action

102370
DRILL - Emergency Load Mgmt Reduction Action
Action
11.06.2018 09:15
11.06.2018 14:30
DOM, FE-ATSI, FE-ME
An Emergency Load Mgmt Reduction Action and a NERC level EEA2 have been issued. Load reduction start times can be found by clicking on the hyperlink(s) in the Regions column. Load reductions should continue until released by PJM. Reductions are mandatory based on product requirements. CSPs should review DR Hub for specific registration details. Lead Time(s) dispatched: Short_60 . Product(s) dispatched: Base DR