Posting 103480: Voltage Reduction Action

103480
DRILL - Voltage Reduction ActionPAI Trigger
Action
05.03.2022 12:00
05.03.2022 14:38
PJM-RTO
A Voltage Reduction Action of 5 % and a NERC level EEA2 have been issued for PJM RTO . NOTE: Curtailment of Non-Essential Building Load should be issued prior to, but no later than the same time as a Voltage Reduction. Additional Comments: 2022 PJM Summer Emergency Procedures Drill. A 5% Voltage reduction action has been Issued for the RTO, 2.5% for city of Chicago, IL.