My Tools
Tools Home
PJM.com
Emergency Procedures
Welcome Guest
(
GUEST
)
|
Sign In
Contact
|
Help
Posting 103807: Emergency Load Mgmt Reduction Action
Back to Dashboard
Msg ID:
103807
Message Type:
Emergency Load Mgmt Reduction Action
Priority:
Action
Effective Start Time:
12.24.2022 05:30
Effective End Time:
12.24.2022 20:30
Regions
AEP, BGE, COMED, DAY, DEOK, DOM, DPL, DUQ, EKPC, FE-AP, FE-ATSI, FE-JC, FE-PN, PECO, PEPCO
An Emergency Load Mgmt Reduction Action and a NERC level EEA2 have been issued. Load reduction start times can be found by clicking on the hyperlink(s) in the Regions column. Load reductions should continue until released by PJM. Reductions are mandatory based on product requirements. CSPs should review DR Hub for specific registration details. Lead Time(s) dispatched: Quick_30 . Product(s) dispatched: Capacity Performance DR