Posting 104654: Pre-Emergency Load Mgmt Reduction Action

104654
Pre-Emergency Load Mgmt Reduction Action
Action
06.23.2025 13:00
06.23.2025 22:00
AECO, BGE, DOM, DPL, FE-JC, FE-ME, FE-PN, PECO, PEPCO, PPL, PSEG
A Pre-Emergency Load Mgmt Reduction Action has been issued. Load reduction start times can be found by clicking on the hyperlink(s) in the Regions column. Load reductions should continue until released by PJM. Reductions are mandatory based on product requirements. CSPs should review DR Hub for specific registration details. Lead Time(s) dispatched: Long_120 . Product(s) dispatched: Capacity Performance DR