My Tools
Tools Home
PJM.com
Emergency Procedures
Welcome Guest
(
GUEST
)
|
Sign In
Contact
|
Help
Posting 104686: Pre-Emergency Load Mgmt Reduction Action
Back to Dashboard
Msg ID:
104686
Message Type:
Pre-Emergency Load Mgmt Reduction Action
Priority:
Action
Effective Start Time:
06.25.2025 13:00
Effective End Time:
06.25.2025 19:00
Regions
AECO, BGE, DOM, DPL, FE-AP, FE-JC, FE-ME, FE-PN, PECO, PEPCO, PPL, PSEG
A Pre-Emergency Load Mgmt Reduction Action has been issued. Load reduction start times can be found by clicking on the hyperlink(s) in the Regions column. Load reductions should continue until released by PJM. Reductions are mandatory based on product requirements. CSPs should review DR Hub for specific registration details. Lead Time(s) dispatched: Long_120 . Product(s) dispatched: Capacity Performance DR