Posting 105099: Pre-Emergency Load Mgmt Reduction Action

105099
Pre-Emergency Load Mgmt Reduction Action
Action
05.18.2026 15:30
05.18.2026 21:00
BGEPEPCO
A Pre-Emergency Load Mgmt Reduction Action has been issued. Load reduction start times can be found by clicking on the hyperlink(s) in the Regions column. Load reductions should continue until released by PJM. Reductions are mandatory based on product requirements. CSPs should review DR Hub for specific registration details. Lead Time(s) dispatched: Quick_30 . Product(s) dispatched: Capacity Performance DR