Posting 105171: Emergency Load Mgmt Reduction Action

105171
DRILL - Emergency Load Mgmt Reduction Action
Action
05.27.2026 09:15
AEPCOMEDDOMDPLFE-ATSI
An Emergency Load Mgmt Reduction Action and a NERC level EEA2 have been issued. Load reduction start times can be found by clicking on the hyperlink(s) in the Regions column. Load reductions should continue until released by PJM. Reductions are mandatory based on product requirements. CSPs should review DR Hub for specific registration details. Lead Time(s) dispatched: Quick_30,Short_60,Long_120 . Product(s) dispatched: Capacity Performance DR