| 105607 |
Action | DRILL - Manual Load Dump Action - Capacity Emergency - NERC EEA 3 | 11.03.2026 12:45 |
PJM-RTO
| Drill: This message type is a potential PAI - see Data Miner
A Manual Load Dump Action - Capacity Emergency - NERC EEA 3 of 1000 MW has been requested. Total load shed is 1000 MW.
Additional Comments: This is the 2026 PJM Winter Emergency Procedures Drill. | |
| 105606 |
Action | DRILL - Curtailment of Non-Essential Building Load - Capacity Emergency - NERC EEA 2 | 11.03.2026 12:02 |
PJM-RTO
| Drill: This message type is a potential PAI - see Data Miner
A Curtailment of Non-Essential Building Load - Capacity Emergency - NERC EEA 2 Action has been issued to provided additional load relief reductions.
Transmission/Generation dispatchers/LSEs switch off all non-essential light and power in LSE-owned commercial, operations, and administration offices.
Additional Comments: This is the 2026 PJM Emergency Procedures Drill. | |
| 105605 |
Action | DRILL - Voltage Reduction Action - Capacity Emergency - NERC EEA 2 | 11.03.2026 12:00 |
PJM-RTO
| Drill: This message type is a potential PAI - see Data Miner
A Voltage Reduction Action - Capacity Emergency - NERC EEA 2 of 5 % has been issued for RTO and 2.5% for city of Chicago .
NOTE: Curtailment of Non-Essential Building Load should be issued prior to, but no later than the same time as a Voltage Reduction.
Additional Comments: This is the 2026 PJM Winter Emergency Procedures Drill. | |
| 105604 |
Warning | DRILL - Manual Load Dump Warning - Capacity Emergency - NERC EEA 3 | 11.03.2026 11:35 |
PJM-RTO
| Drill: This message type is a potential PAI - see Data Miner
A Manual Load Dump Warning - Capacity Emergency - NERC EEA 3 has been issued as of 11:35 on 11.03.2026 .
Additional Comments: This is the 2026 PJM Winter Emergency Procedures Drill | |
| 105602 |
Action | DRILL - Emergency Use of Back-Up Generator Action - Capacity Emergency | 11.03.2026 11:30 |
PJM-RTO
|
Drill
An Emergency Use of Back-Up Generator Action - Capacity Emergency has been issued to direct Large Loads to operate on Back-Up Generation. PJM will also issue a Manual Load Dump Warning at this time.
Refer to PJM M-13 Attachment O for additional Information.
Additional Comments: This is the Winter 2026 PJM Emergency Procedures Drill. | |
| 105603 |
Action | DRILL - Deploy All Resources Action - Capacity Emergency - NERC EEA 2 | 11.03.2026 11:15 |
PJM-RTO
| Drill: This message type is a potential PAI - see Data Miner
A Deploy All Resources Action - Capacity Emergency - NERC EEA 2 has been issued.
- Member Generation Dispatchers raise all available online generating units to full output (Emergency Maximum).
- Member Generation Dispatchers start up all offline generation as soon as possible and ramp to full output (Emergency Maximum).
- Member Curtailment Service Providers with Load Management (Pre-Emergency and/or Emergency) reduce load immediately when dispatched.
- Transmission/Generation Dispatchers notify management of the emergency procedure and that they should consider the use of public appeals to conserve electricity usage.
- Member dispatchers notify governmental agencies, as applicable.
Additional Comments: This is the 2026 PJM Winter Emergency Procedures Drill | |
| 105601 |
Warning | DRILL - Emergency Use of Back-Up Generator Warning - Capacity Emergency | 11.03.2026 11:00 |
PJM-RTO
|
Drill
An Emergency Use of Back-Up Generator Warning - Capacity Emergency has been issued for 11.03.2026 to warn of the potential need to direct Large Loads to operate on Back-Up Generation.
Refer to PJM M-13 Attachment O for additional Information.
Additional Comments: This is the Winter 2026 PJM Emergency Procedures Drill | |
| 105600 |
Warning | DRILL - Voltage Reduction Warning and Reduction of NCPL | 11.03.2026 10:37 |
PJM-RTO
| Drill: This message type is a potential PAI - see Data Miner
A Voltage Reduction Warning and Reduction of NCPL has been issued. Actual Synchronized (or Spinning) Reserves are less than the Synchronized (or Spinning) Reserve requirement.
PJM Member Actions:
1. Generation dispatchers order all generating stations to curtail non-essential station light and power.
Additional Comments: This is the winter 2026 PJM Emergency Procedures Drill | |
| 105599 |
Warning | DRILL - Primary Reserve Warning | 11.03.2026 10:08 |
PJM-RTO
|
Drill
A Primary Reserve Warning has been issued from 10:08 on 11.03.2026 through 15:00 on 11.03.2026 Actual primary reserves are lesser than the requirement. Primary Reserve Objective is 2614 MW.
Additional Comments: This is the 2026 PJM Winter Emergency Procedures Drill | |
| 105590 |
Action | DRILL - Pre-Emergency Load Mgmt Reduction Action | 11.03.2026 09:15 | RECO
|
Drill
A Pre-Emergency Load Mgmt Reduction Action has been issued. Load reduction start times can be found by clicking on the hyperlink(s) in the Regions column. Load reductions should continue until released by PJM. Reductions are mandatory based on product requirements. CSPs should review DR Hub for specific registration details. Lead Time(s) dispatched: Quick_30 . Product(s) dispatched: Capacity Performance DR | |
| 105591 |
Action | DRILL - Pre-Emergency Load Mgmt Reduction Action | 11.03.2026 09:15 | AECO
AEP
BGE
COMED
DAY
DEOK
DOM
DPL
DUQ
EKPC
FE-AP
FE-ATSI
FE-JC
FE-ME
FE-PN
PECO
PEPCO
PPL
PSEG
|
Drill
A Pre-Emergency Load Mgmt Reduction Action has been issued. Load reduction start times can be found by clicking on the hyperlink(s) in the Regions column. Load reductions should continue until released by PJM. Reductions are mandatory based on product requirements. CSPs should review DR Hub for specific registration details. Lead Time(s) dispatched: Quick_30,Short_60,Long_120 . Product(s) dispatched: Capacity Performance DR | |
| 105592 |
Action | DRILL - Emergency Load Mgmt Reduction Action | 11.03.2026 09:15 | AECO
|
Drill
An Emergency Load Mgmt Reduction Action and a NERC level EEA2 have been issued. Load reduction start times can be found by clicking on the hyperlink(s) in the Regions column. Load reductions should continue until released by PJM. Reductions are mandatory based on product requirements. CSPs should review DR Hub for specific registration details. Lead Time(s) dispatched: Short_60 . Product(s) dispatched: Capacity Performance DR | |
| 105594 |
Action | DRILL - Emergency Load Mgmt Reduction Action | 11.03.2026 09:15 | DUQ
EKPC
FE-JC
PECO
PEPCO
|
Drill
An Emergency Load Mgmt Reduction Action and a NERC level EEA2 have been issued. Load reduction start times can be found by clicking on the hyperlink(s) in the Regions column. Load reductions should continue until released by PJM. Reductions are mandatory based on product requirements. CSPs should review DR Hub for specific registration details. Lead Time(s) dispatched: Quick_30 . Product(s) dispatched: Capacity Performance DR | |
| 105595 |
Action | DRILL - Emergency Load Mgmt Reduction Action | 11.03.2026 09:15 | FE-PN
|
Drill
An Emergency Load Mgmt Reduction Action and a NERC level EEA2 have been issued. Load reduction start times can be found by clicking on the hyperlink(s) in the Regions column. Load reductions should continue until released by PJM. Reductions are mandatory based on product requirements. CSPs should review DR Hub for specific registration details. Lead Time(s) dispatched: Quick_30,Short_60 . Product(s) dispatched: Capacity Performance DR | |
| 105593 |
Action | DRILL - Emergency Load Mgmt Reduction Action | 11.03.2026 09:15 | FE-ME
|
Drill
An Emergency Load Mgmt Reduction Action and a NERC level EEA2 have been issued. Load reduction start times can be found by clicking on the hyperlink(s) in the Regions column. Load reductions should continue until released by PJM. Reductions are mandatory based on product requirements. CSPs should review DR Hub for specific registration details. Lead Time(s) dispatched: Long_120 . Product(s) dispatched: Capacity Performance DR | |