| 105186 |
Action | DRILL - Manual Load Dump Action | 05.27.2026 12:30 |
PJM-RTO
|
Drill
A Manual Load Dump Action of 2000 MW and an EEA3 have been requested. Total load shed from all active Manual Load Dump Actions within this Region is 2000 MW.
Additional Comments: This is a drill only.
. MIDATL share 865 MW
. AEP share 195 MW
. FE South (AP) share 145 MW
. DAYT share 57 MW
. DLCO share 58 MW
. CE share 125 MW
. DOM share 266 MW
. FE West share 180 MW
. CPP share 5 MW
. DEOK share 90 MW
. EKPC share 14 MW | 05.27.2026 13:45 |
| 105185 |
Action | DRILL - Curtailment of Non-Essential Building Load | 05.27.2026 12:00 |
PJM-RTO
| Drill: This message type is a potential PAI - see Data Miner
A Curtailment of Non-Essential Building Load Action has been issued to provided additional load relief reductions.
Transmission/Generation dispatchers/LSEs switch off all non-essential light and power in LSE-owned commercial, operations, and administration offices.
Additional Comments: This is a drill only. | |
| 105184 |
Action | DRILL - Voltage Reduction Action | 05.27.2026 12:00 |
PJM-RTO
| Drill: This message type is a potential PAI - see Data Miner
A Voltage Reduction Action of 5 % and a NERC level EEA2 have been issued for PJM RTO .
NOTE: Curtailment of Non-Essential Building Load should be issued prior to, but no later than the same time as a Voltage Reduction.
Additional Comments: This is a drill only. | |
| 105183 |
Action | DRILL - Maximum Generation Emergency Action | 05.27.2026 11:45 |
PJM-RTO
| Drill: This message type is a potential PAI - see Data Miner
A Maximum Generation Emergency Action has been issued.
Additional Comments: This is a drill only. PJM is requesting all FUEL LIMITED GENERATION be loaded and all REGULATION (EXCEPT HYDRO UNITS) SUSPENDED. | |
| 105181 |
Warning | DRILL - Manual Load Dump Warning | 05.27.2026 11:25 |
PJM-RTO
| Drill: This message type is a potential PAI - see Data Miner
A Manual Load Dump Warning has been issued as of 11:25 on 05.27.2026
Additional Comments: This is a drill only.
. MIDATL share 865 MW
. AEP share 195 MW
. FE South (AP) share 145 MW
. DAYT share 57 MW
. DLCO share 58 MW
. CE share 125 MW
. DOM share 266 MW
. FE West share 180 MW
. CPP share 5 MW
. DEOK share 90 MW
. EKPC share 14 MW | |
| 105180 |
Action | DRILL - Deploy All Resources Action | 05.27.2026 11:15 |
PJM-RTO
| Drill: This message type is a potential PAI - see Data Miner
A Deploy All Resources Action , and associated NERC Energy Emergency Alert Level 2 [EEA2], has been issued.
- Member Generation Dispatchers raise all available online generating units to full output (Emergency Maximum).
- Member Generation Dispatchers start up all offline generation as soon as possible and ramp to full output (Emergency Maximum).
- Member Curtailment Service Providers with Load Management (Pre-Emergency and/or Emergency) reduce load immediately when dispatched.
- Transmission/Generation Dispatchers notify management of the emergency procedure and that they should consider the use of public appeals to conserve electricity usage.
- Member dispatchers notify governmental agencies, as applicable.
Additional Comments: This is a drill only. | |
| 105182 |
Action | DRILL - Maximum Generation Emergency Action | 05.27.2026 11:00 |
PJM-RTO
| Drill: This message type is a potential PAI - see Data Miner
A Maximum Generation Emergency Action has been issued.
Additional Comments: This is a drill only. PJM is requesting that all MAXIMUM EMERGENCY Steam be loaded. | |
| 105179 |
Warning | DRILL - Voltage Reduction Warning and Reduction of NCPL | 05.27.2026 10:45 |
PJM-RTO
| Drill: This message type is a potential PAI - see Data Miner
A Voltage Reduction Warning and Reduction of NCPL has been issued. Actual Synchronized (or Spinning) Reserves are less than the Synchronized (or Spinning) Reserve requirement.
PJM Member Actions:
1. Generation dispatchers order all generating stations to curtail non-essential station light and power.
Additional Comments: This is a drill only | |
| 105178 |
Action | DRILL - Emergency Voluntary Energy Only Demand Response | 05.27.2026 10:30 |
PJM-RTO
|
Drill
An Emergency Voluntary Energy Only Demand Response Reduction Action has been issued. Load reduction is expected to be implemented as soon as possible and is requested to remain reduced as long as possible or until cancelled by PJM. CSPs should review DR Hub for specific registration details. Dispatched Control Zone(s) only.
Additional Comments: This is a drill only | |
| 105177 |
Action | DRILL - Maximum Generation Emergency Action | 05.27.2026 10:15 |
PJM-RTO
| Drill: This message type is a potential PAI - see Data Miner
A Maximum Generation Emergency Action has been issued.
Additional Comments: This is a drill only. PJM requesting the loading of Maximum Emergency Generation for CT units Only. | |
| 105176 |
Warning | DRILL - Primary Reserve Warning | 05.27.2026 10:00 |
PJM-RTO
|
Drill
A Primary Reserve Warning has been issued from 10:00 on 05.27.2026 through 14:30 on 05.27.2026 Actual primary reserves are lesser than the requirement. Primary Reserve Objective is 2595 MW.
Additional Comments: This is a drill only. | |
| 105170 |
Action | DRILL - Emergency Load Mgmt Reduction Action | 05.27.2026 09:15 | FE-ME
|
Drill
An Emergency Load Mgmt Reduction Action and a NERC level EEA2 have been issued. Load reduction start times can be found by clicking on the hyperlink(s) in the Regions column. Load reductions should continue until released by PJM. Reductions are mandatory based on product requirements. CSPs should review DR Hub for specific registration details. Lead Time(s) dispatched: Long_120 . Product(s) dispatched: Capacity Performance DR | |
| 105172 |
Action | DRILL - Emergency Load Mgmt Reduction Action | 05.27.2026 09:15 | BGE
DAY
FE-AP
PPL
|
Drill
An Emergency Load Mgmt Reduction Action and a NERC level EEA2 have been issued. Load reduction start times can be found by clicking on the hyperlink(s) in the Regions column. Load reductions should continue until released by PJM. Reductions are mandatory based on product requirements. CSPs should review DR Hub for specific registration details. Lead Time(s) dispatched: Quick_30,Long_120 . Product(s) dispatched: Capacity Performance DR,Capacity Performance DR | |
| 105171 |
Action | DRILL - Emergency Load Mgmt Reduction Action | 05.27.2026 09:15 | AEP
COMED
DOM
DPL
FE-ATSI
|
Drill
An Emergency Load Mgmt Reduction Action and a NERC level EEA2 have been issued. Load reduction start times can be found by clicking on the hyperlink(s) in the Regions column. Load reductions should continue until released by PJM. Reductions are mandatory based on product requirements. CSPs should review DR Hub for specific registration details. Lead Time(s) dispatched: Quick_30,Short_60,Long_120 . Product(s) dispatched: Capacity Performance DR | |
| 105174 |
Action | DRILL - Emergency Load Mgmt Reduction Action | 05.27.2026 09:15 | AECO
|
Drill
An Emergency Load Mgmt Reduction Action and a NERC level EEA2 have been issued. Load reduction start times can be found by clicking on the hyperlink(s) in the Regions column. Load reductions should continue until released by PJM. Reductions are mandatory based on product requirements. CSPs should review DR Hub for specific registration details. Lead Time(s) dispatched: Short_60 . Product(s) dispatched: Capacity Performance DR | |